Scale In Delay Analysis
Use this query to estimate how long a revision waits between the previous scale signal and a scale-in event, which helps identify cooldown-driven behavior.
Data Source
| Table | Schema Note |
ContainerAppSystemLogs_CL | Legacy schema. If empty, try ContainerAppSystemLogs (non-_CL). |
Query Pipeline
flowchart TD
A[Filter scale lifecycle logs] --> B[Sort by revision and time] --> C[Attach previous signal] --> D[Calculate delay and cooldown hint]
Query
let AppName = "my-container-app";
let Window = 24h;
ContainerAppSystemLogs_CL
| where ContainerAppName_s == AppName and TimeGenerated >= ago(Window)
| where isnotempty(RevisionName_s)
| where Log_s has_any ("scale", "keda", "replica", "cooldown", "deactivate", "assigning replica", "terminating")
| project TimeGenerated, RevisionName_s, ReplicaName_s, Reason_s, Log_s
| order by RevisionName_s asc, TimeGenerated asc
| serialize
| extend PreviousTimeGenerated = iff(prev(RevisionName_s) == RevisionName_s, prev(TimeGenerated), datetime(null))
| extend PreviousReason_s = iff(prev(RevisionName_s) == RevisionName_s, prev(Reason_s), "")
| extend ScaleInSignal = case(Log_s has "cooldown", "Cooldown", Log_s has "deactivate", "ScalerDeactivation", Log_s has "scale-in", "ScaleIn", Log_s has "terminating", "ReplicaTermination", "Other")
| where ScaleInSignal != "Other"
| extend DelaySeconds = datetime_diff('second', TimeGenerated, PreviousTimeGenerated)
| extend CooldownAssessment = case(isnull(PreviousTimeGenerated), "No prior scale signal in window", DelaySeconds >= 300, "At or above 300s custom cooldown", DelaySeconds >= 240, "Near 300s cooldown", "Shorter than 300s cooldown")
| project TimeGenerated, RevisionName_s, ReplicaName_s, ScaleInSignal, DelaySeconds, PreviousReason_s, CooldownAssessment
| order by TimeGenerated desc
Example Output
| TimeGenerated | RevisionName_s | ReplicaName_s | ScaleInSignal | DelaySeconds | PreviousReason_s | CooldownAssessment |
| 2026-04-12T10:18:47.551Z | ca-myapp--0000001 | ca-myapp--0000001-6f87d9bd77-cs92n | ScalerDeactivation | 308 | AssigningReplica | At or above 300s custom cooldown |
| 2026-04-12T10:18:51.903Z | ca-myapp--0000001 | ca-myapp--0000001-6f87d9bd77-cs92n | ReplicaTermination | 4 | KEDAScalersStopped | Shorter than 300s cooldown |
| 2026-04-12T11:02:15.114Z | ca-myapp--0000002 | ca-myapp--0000002-78d6d4b9d9-8wqqm | ScaleIn | 252 | AssigningReplica | Near 300s cooldown |
Interpretation Notes
- Delays around 300 seconds are consistent with the default custom scaler cooldown used when the final replica scales to zero.
- Very short delays after a deactivation event usually indicate the platform is already committing the replica removal sequence.
- Compare revisions to isolate whether only one revision experiences long scale-in delays.
Limitations
- This is an inferred cooldown view based on adjacent log records, not a direct platform timer.
- The 300 second default applies only to custom scale rules when scaling from the last replica to zero.
See Also
Sources